To sign up for our FREE Newsletter please enter your Name & Email below:

Case Studies

Case Study 1

Quicknet Application.
Mr Crown, Selborne Road, Hove, East Sussex

electric underfloor cs1Jointing Technologies recently completed the Supply and Install of Raychem Underfloor Heating at Selborne Road, Hove. In excess of 200m2 of the Quicknet project was successfully installed on the project.

The project enabled the owner to benefit from underfloor heating in every area of the house, but gave the flexibility of different levels and times via independently programmable digital thermostats.

The owner, Daniel Crown said " It was a breeze, initial contact was made and within a day a free on site visit had been made and a full written quotation received."

"Jointing Technologies then fitted in with our design brief and completed installation as required".


Case Study 2

Mr A Richards, Woking

electric underfloor cs2_1Jointing Technologies recently supplied 2 Raychem T2 160 Watt matts online to Andrew Richards.

A 1m2 was installed in the W.C under tiles. In the shower room a 3m2 was installed all with T2 digital thermostats. Both areas took Andrew in total 2 hours to install.

Mr Richards said, " I searched via google as I wanted a recognised brand and Jointing Technologies website offered a quick , care free online portal. The product arrived the next day carriage paid and perfectly packaged".